Fuel quality
We never compromise on quality
Fuel quality is our company’s core value. To ensure that our customers get only the best fuel, we choose suppliers responsibly and control the fuel transportation at all stages – from factories to gas stations. In addition, each batch of fuel is inspected for compliance with state standards and the Technical Regulations of the Customs Union.
Quality control before shipment of fuel from the oil refinery plant
Factory quality control laboratories conduct a comprehensive study of fuel for compliance with GOST and the Technical Regulations of the Customs Union. In case of compliance, a quality certificate is issued for each batch.
Fuel safety in rail tank cars
Oil products are sent by rail to the bulk plants from the refinery. Each tank is sealed with disposable seals and is in the carrier custody. The arrived fuel must be checked in certified laboratories of bulk plants before being discharged into storage tanks.
Fuel delivery to filling stations
Fuel delivery to filling stations Fuel is delivered from bulk plants to filling stations by road. Each compartment of the tanker is sealed with a one-time numbered seal to ensure the safety of the quality and quantity of the product at the exit from the tank farm. All Aurika fuel trucks are equipped with GPS trackers, which allow remote control of fuel transportation along the entire route.
Fuel quality control at the gas station
Upon arrival at the gas station, the fuel passes the acceptance check. Before draining the fuel from the tanker into the underground tank of the gas station, the fuel is checked for the absence of mechanical impurities and water. The control of these parameters eliminates the risk of foreign liquids entering the oil product and mixing them.
Monitoring the operation of fuel dispensers
Each gas station of the company "Aurika" monthly passes a sudden check of the level of filling of fuel dispensers and fuel quality using mobile laboratories. If any deviation of the parameters from the standard is detected, the implementation will be stopped immediately.